MOQ | 100 Piece/Pieces |
Port | chongqing |
Packaging | 1.Packing in plastic bags and boxes |
Lead Time | 15-20 days after receiving the deposit |
Place of Origin | Chongqing, China (Mainland) | Model Number | X-125 |
Color | picture shows | type | steering handle pipe |
Quality | high | Packing | plastic bags |
Type | Handlebar |
The LinShui EDZ of the South Industrial Park Two District No48.