MOQ | 1 pc |
Port | shenzhen |
Packaging | wooden carton |
Lead Time | 20 days |
The main test is the electrical performance of power transformers
with less than 12 sets of secondary output, voltage resistance,
and the insulation between turns of primary winding, winding
resistance. Ensure that the product is loaded and clipped at one
time, and the whole test process is completed automatically,
which can save 2-3 testers and improve the test
efficiency.
Operating
software in Chinese, running in windons98/200 /XP environment,
open program editing platform, users can edit test steps
according to requirements, simple and easy to learn.
System test projects:
1)No-load
loss
2)No-load
current
3)No-load
voltage
4)No-load
power
5)Turn
to turn insulation test
6)Power
frequency withstand voltage:5KV,100
mA
7)Bar
code reading
8)Intelligent
instrument, direct storage and judgment of test data, software
and industrial computer are needed in the background; Scanning
bar
code system: data storage, printing and output
characteristics
Floor 3 Building A Xiahefang No.1 Xinhe Community Wanjiang District Dongguan City Guangdong province China