Place of Origin | Zhejiang, China | Brand Name | JET,OSCAN,KRAFT&DELE,OEM,ODM |
Model Number | JT3500CX | Rated Power | 2.5kw |
Output Type | AC single phase/AC 3 phase | Rated Voltage | 110V/220V,220V/380V |
Rated Current | 12V/8.3A | Speed | 3000RPM/3600RPM |
Frequency | 50/60HZ | Engine type | Air-cooled Gasoline Engine |
Product name | Portable Gasoline Generator | Starting system | Recoil Start+Electric Start |
Color | any | Certificate | CE ISO9001 |
Function | Outdoor Activity | Item | Professional 3 Phase Gasoline Generator |
Warranty | 1 Year | Name | Recoil or electric petrol generator 6.5hp gasoline silent generator |
Type | Open Frame |
Zhejiang Jet Machinery & Electronic Co.,Ltd.,as a cross-sectoral integrated operating company, consists of a Christmas tree, electric tools, plastics,import and export of four branches,and our products cover the Christmas tree, plastic, general machinery,plastic products and other products.The whole company cover an area of more than 200 thousand square km,plant area of 450 thousand square meters, with modern production equipment.More than 1200 employees undrer the leadership of board chairman(Mr.Jet yan),the company maintained its annual 20% or moreof the growth rate.In 2009 the company achieved total output value of 800million RMB(USD135 million).
JRT POER Co.,ltd. was established in 2007,our product covering the gasoline engine,gasoline/diesel generator sets, chain saw,pressure washer and other products.Since the establishment,quality always have been consired as our first priority and lifeline,and we activily forge ahead.Companies operate in strict accordance with ISO9000 standards.Having passed CE,GS quality certification,so far products have been sold to more than 30 countries and regions.
1. Q: Where is your loading sea port?
A:ningbo,china
2. Q:What is your MOQ of this item?
A: Sample order is acceptable.
3. Q: Is it all right to make customer's own brand
name?
A: We can be your OEM manafacture with your
authorization of brand.
4. Q: What is the lead time?
A: As usually, 25-35 days after receiving TT
deposit or L/C. But we will finish order with shorter
time for your urgent need.