MOQ | 3000 meters |
Port | Shanghai |
Packaging | Usual packed in roll and wrapped with plastic.Or we can also packed as your requirement. |
Lead Time | 15days |
Material | Rubber | Color | red and blue,or red and green |
Reinforcement | Fiber Braid | Temperature | -30C~+70C |
Size | 1/4"~2" | Working pressure | 20bar |
Brand | Accept OEM |
Size
Item No. | I.D. | O.D.(reference) | W.P. | B.P. | |
mm | inch | mm | Psi* | Psi* | |
HGJ101-001 | 5 | 3/16 | 11.5 | 300 | 900 |
HGJ101-002 | 6 | 1/4 | 12.5 | 300 | 900 |
HGJ101-003 | 8 | 5/16 | 15 | 300 | 900 |
HGJ101-004 | 10 | 3/8 | 16.5 | 300 | 900 |
HGJ101-005 | 13 | 1/2 | 22 | 300 | 900 |
HGJ101-006 | 16 | 5/8 | 26 | 300 | 900 |
HGJ101-007 | 19 | 3/4 | 29 | 300 | 900 |
HGJ101-008 | 25 | 1 | 36 | 300 | 900 |
HGJ101-009 | 32 | 11/4 | 44 | 300 | 900 |
HGJ101-010 | 38 | 11/2 | 52 | 300 | 900 |
Advantages
(1) We have ISO 14001,ISO9001,ISO3821 Certificate
(2) We have 10 production lines and two Automatic production line.
(3)We accept OEM, and also can according to your request to package.
(4) We provide free sample and accept small trial order.
(5) Our equipments and raw materials are imported from Taiwan, Japan, Korea.
1.Usual packed in roll and wrapped with
plastic.Or we can also packed as your
requirement.
2. 20/30/50/100m per roll as required.
2. Standard dual protective packaging; transparent PE film intertwined inner layer; braided spiraled outer layer;
4. an 20GP CONTAINER: 90000m of single line hose.
DELIVERY DATE: 15-25DAYS
No.289,Nanhai Road, Binhai Industry Area, Qidong city, China.