Port | Shenzhen, China |
Packaging | 1, PE bubble bag for each part. 2, Layout the parts into A=A cartons. 3, Layout the cartons into pallets. |
Lead Time | 20-45 days |
Place of Origin | Guangdong, China (Mainland) | Brand Name | Btai |
Model Number | Customized | Part name | Auto air conditioning outlet |
Part material | ABS | Color | Black, white, gray, and other colors |
Application 1 | Automotive Spare Parts | Application 2 | Car air condition |
Type | Car Accessories | Mode Shape | Plastic injection molding |
Design | OEM & ODM | Size | Customized |