MOQ | 1 Piece/Pieces |
Manufacturing Process | Rolled Thread | Material | chrome steel,stainless steel,alloy steel,50CrMo4 |
Length | as requested | Model Number | as requested |
Place of Origin | Liaoning, China (Mainland) | Brand Name | MC |
Rigidity | 3u03bcm~19797u03bcm | Structure | Screw and nut cap and steel ball |
Accuracy grade code | C0, C1, C2, C3, C5, C7, C10 | The Nut material | GCr15 |
Nominal dia | 8mm~200mm | Basic lead | 1.5mm~40mm |
Noise | Z1 Z2 Z3 | Axial clearance and preloard code | P0, P1, P2, P3, P4 |
Warranty | 12 months | name | High Quality 1000mm long leadscrew 1204 ball screw Manufacturer |
No. 9, 8/F, Unit 1, No. 20A, Gangwan Street, Zhongshan District