MOQ | 1 Unit/Units |
Port | Tianjin/Dalian |
Packaging | Delivery Date: The Seller shall deliver the Goods to border within 60 calendar days from the date of receiving the T/T down payment from the Buyer,on the condition that the Seller also have received the balance payment from the Buyer. |
Lead Time | within 60 calendar days from the date of receiving the T/T DP |
Condition | New | Type | SUV |
Fuel | Gas/Petrol | Gear Box | manual |
Made In | China | Steering | Left |
Drive | RWD | Brand Name | FAW |
Place of Origin | Jilin, China (Mainland) | Model | X40 |
Year | 2017 | Month | 5 |
Product Name | X40 Passenger Vehicle | Transmission | 5 gears manaul/6 gears AMT |
displacement(L) | 1.6 | length(mm) | 4310 |
width(mm) | 1780 | height(mm) | 1680 |
Wheel Base(mm) | 2600 | engine type | CA4GB16 |
intake type | NA | Color | As Picture |