MOQ | 100 Piece/Pieces |
Port | Qingdao is preferred |
Packaging | packed in wooden case or pallet with plastic cover protection |
Lead Time | 2~3 weeks for mould,2~3 weeks for new production |
Place of Origin | Shandong, China (Mainland) | Model Number | Customized |
Brand Name | OEM Brand | Material | Ductile Iron |
Surface Treatment | shot blasting,deburr, phosphating, spray lacquer etc | Certificate | ISO2000-2008 |
Standard | ANSI/ASTM, BS, DIN, NFA, JIS, and ISO | Commodity | Machining casting parts |
Tolerance | as required | Sample time | 2~3weeks for mould,1~2weeks for sample preparation |