MOQ | 1 Piece |
Port | Dalian |
Packaging | plastic film plus pallet |
Lead Time | Within 30 days |
Material: ductile iron (DI); Coating: Fusion bond epoxy.standard: ISO2531,BS EN545, BS EN598, AWWA C219, AWWA C110, ASME B16.42; FBE coating; suitable medium: potable water, drainage, sewage, waste water; suitable tempreture: -40°~ 125°; packing: plastic film plus pallet; origin: China.