MOQ | 1 Piece/Pieces |
Place of Origin | Zhejiang, China | Brand Name | BIOTE |
Model Number | ZTY100 | Usage | BOAT, Car, Home Appliance, Industrial |
Certification | CCC, ce | Type | Micro Motor |
Torque | 1.8 | Construction | Permanent Magnet |
Commutation | Brush | Protect Feature | Totally Enclosed |
Speed(RPM) | 600rpm,750rpm,1500rpm,3000rpm | Continuous Current(A) | 0.8(A) |
Efficiency | Ie 3 | power | 1kw |
ZYT Series PM DC Motor is used with Ferrite
PM magnet, clouse and self-cooling. It is used for
driven element in any equipment system.
1. Model Explanation
130ZYT
1.130 indicates motor frame No,. The frame No,is
indicated with 55,70,90,110,130(The frame No,
corresponds with frame Dia.
55,70,90,110,130mm).
2.ZYZ indcates PM DC Motor.
3.08 indicates the lamination length No,.01-49
refers to short lamination types, 51-99 refers to
long lamination types and 101-149 refers to special
long lamination types.
4.H1 refers to derivative structure , its No, is
indicated with H1,H2,H3…(Each frame No, is arranged
on custemor ‘s requirement in order.)
3.Mounting Model
1.Housing Mounting: A5(single shaft
extension),AA5(double shaft extension) and frame
No,(55-130).
2.Flange Mounting:A3(single shaft
extension),AA3(double shaft extension) and frame
No,(55-130).
3.Foot Mounting: A1(single shaft
extension),AA1(double shaft extension) and frame
No,(90-130).
ZYT Series PM DC Motor is used with Ferrite PM
magnet, clouse and self-cooling. It is used for
driven element in any equipment system.
2. Model Explanation
130 ZYZ 08 /H1
1.130 indicates motor frame No,. The frame No,is
indicated with 55,70,90,110,130(The frame No,
corresponds with frame Dia.
55,70,90,110,130mm).
2.ZYZ indcates PM DC Motor.
3.08 indicates the lamination length No,.01-49
refers to short lamination types, 51-99 refers to
long lamination types and 101-149 refers to special
long lamination types.
4.H1 refers to derivative structure , its No, is
indicated with H1,H2,H3…(Each frame No, is arranged
on custemor ‘s requirement in order.)
3.Mounting Model
1.Housing Mounting: A5(single shaft
extension),AA5(double shaft extension) and frame
No,(55-130).
2.Flange Mounting:A3(single shaft
extension),AA3(double shaft extension) and frame
No,(55-130).
3.Foot Mounting: A1(single shaft
extension),AA1(double shaft extension) and frame
No,(90-130).
A.Certificates passed:All tests passed for most of our motors and can supply reports.
B.Fast feedback for customers:24 hours reply for
all customers' inquiries.
C. Competitive prices.
D. Quality guarantee:We have shipped much motors to
Italy, Spain, and other European and USA customers
with high quality.
E. Fast and Timely delivery:Usually 10-15 days for
goods production.
F. Professional Technical support and After-sale
service.
G.Customized service for kind of motor according to
your requirement.
Q1: What kind motors you can provide?
A1: For now, we mainly provide permanent
magnet brush dc motors, brushless dc motor, dc gear
motor, micro dc motor, ac gear motor, planetary
gear motor, with diameter range in 42~110mm. NEMA
dc motor. NEMA dc Motor. stainless steel motor
Q2: Is there a MOQ for your motors?
A2: No. we can accept 1 pcs for sample
making for your testing,and the price for sample
making will have 30% to 50% difference based on
different style.
Q3: Could you send me a price list?
A3: For all of our motors, they are
customized based on different requirements like
power, voltage, gear ratio, rated torque and shaft
diameter etc. The price also varies according to
different order qty. So it’s really difficult for
us to provide a price list. If you can share your
detailed specification and order qty, we’ll see
what offer we can provide.
Q4: Are you motors reversible?
A4: Yes, nearly all dc and ac motor are
reversible. We have technical people who can teach
how to get the function by different wire
connection.
Q5:How about your delivery time?
A5: For micro brush dc gear motor, the
sample delivery time is 2-5 days, bulk delivery
time is about 15-20 days, depends on the order qty.
For brushless dc motor, the sample deliver time is
about 10-15 days; bulk time is 15-20 days.Please
take the sales confirmation for final
reference.