Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

cheaper price custom forged 3 inch brass valve ball

FOB Price 2 - 29 USD / Piece
MOQ100 Piece/Pieces

Quick Details (View All)

TypeBALL VALVES, Gate Valves, Stop & Waste Valves, Washing Machine Valves, Water Heater Service Valves, Gas Appliance Isolation Shut-Off Valves, Kitchen Gas Shut-Off Valves, Emergency Shut-Off Valves, Place of OriginGuangdong, China
Brand NameJinheyuan Model NumberG1
ApplicationGeneral Temperature of MediaNormal Temperature
PowerManual MediaWater
Product namebrass ball valve Body materialCarbon Steel
Colorbrown UsageWater Control
ItemMolded Rubber Parts

Product Details

Product Description
Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine
PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
FAQ
Q1. Are you manufacturer?
-Yes, we 're manufacturer with more than 3000 square meters and over 70 personnel.

Q2. What products do you produce?
- Jinheyuan is a professional manufacturer of high quality stainless steel, ordinary carbon steel and alloy steel with an annual
production capacity of 800 tons of castings.We produce a wide range of products, mainly including all kinds of mechanical parts:
building hardware, medical equipment accessories, glass hardware, doors and Windows hardware, power tool parts, pneumatic tool
parts, auto parts, Marine hardware, plumbing equipment parts and lighting equipment accessories.

Q3. Can we use our LOGO and design?
-Of course, we offer OEM/ODM service.

Q4.What’s the sample cost?
-The sample and shipping charges will be required.
Once the mass production order is placed, the sample charges will be deducted.

Q5.Do you inspect the finished products?
-Yes, each step during production will be inspected by our QC team.

Q6.What’s the payment term?
- Trade Assurance Payment,TT(30% deposit),L/C.

Q7.Any warranty for the goods?
-Normally 2 year warranty after delivery except artificial damage.

Q8.What is the lead time for mass production?
-Normally 30-45 days after deposit.

Please provide product drawings or parameters, we will quote you as soon as possible

Back To Home
Register Your Company