Dear ,
Im writing to enquire about the offers can you make for a dredging work that we need.
We need to dredge about 12 meters below sea level ( target Level -9.00 ),
Its 3500000 m3 in silty sand with Gravel Soil.
Dumping area for dredged material should be 500 meters from dredging area.
Discharge rate 5000 m3/day or 1000 m3/Day or 15000 m3/Day.
The maximum level for natural sea bed is -2.00 .
Location on Jeddah, KSA.
i attached to this mail the plan of the harbor and the geo. Report.
i would appreciate it if you could inform me as soon as possible.
Eng/ Ahmed Fat-hi
Manager of Marine Construction Consultant Office - Eng./ Hassan Kassem
Have you found what you were looking for? No? Post Your requirements for FREE!