Port | Dalian Port |
Packaging | Standard Packaging |
Lead Time | 2.5-3 months from order to delivery |
Working pressure | 2000PSI-15000PSI | Working temperature | - 29℃-121℃(PU) |
Lead Time | 2.5-3 months from order to delivery |
Product Details:
CG-22 Casing Hanger:
Combined in a single unit, the CG-22 wrap-around Casing Hanger incorporates pack-off, slip bowl, and slips. When the casing load is suspended, the pack off automatically seals the casing annulus below the slips. The CG-22 Hanger’s controlled friction reduces casing deflection, can be easily installed, and is economical.
CG-29 Casing Hanger:
The CG-29 Casing Hanger provides high hanging capacity with minimum casing deflection. When the upper slips move down and energize the pack off, the CG-29’s non-tapered lower slips engage automatically and apply controlled compression. The lower slips do not move down the pipe, thus they do not create the high compressive forces, as do conventional tapered slips. The CG-29 offers far less casing deflection and much greater hanging capacity than other conventional hangers.
CG-21 Casing Hanger:
Slips, slip bowl and a type H pack off seal ring are all combined in the CG-21. The type “H” pack off provides a positive annulus pack off after the casing has been suspended and cut off.
Casing Size |
Nominal Bowl Size |
|||
11" |
13-5/8" |
16-3/4" |
20" |
|
4-1/2" |
1,3 |
|||
5" |
1,2,3 |
|||
5-1/2" |
1,2,3,4 |
3 |
||
6-5/8" |
1,2,3,4 |
|||
7" |
1,2,3,4 |
1,2,3,4 |
||
7-5/8" |
2,3,4 |
1,2,3,4 |
||
8-5/8" |
1,2,3,4 |
|||
9-5/8" |
1,2,3,4 |
2,3,4 |
||
10-3/4" |
2,3 |
2,3,4 |
2 |
|
11-3/4" |
2,3,4 |
2 |
||
13-3/8" |
2,3,4 |
2,3 |
||
16" |
2,3 |
Dalian Changjiang Office Building .2039 ROOM. No.123 Chang Jiang Road ,Zhong Shan District