MOQ | 1 set |
Port | ningbo,shanghai |
Packaging | 1 set/wooden box |
Lead Time | around 5 days |
1.Match with folder , one-step seal the 4 sides of mask
2.Double motor, 10cm moulder
3.Cylinder air control the height of film
4.18K/2600W control box
5.Replace general needle and thread, with better cost and speed
6.Accurate and durable alloy rollers
7.Without smoke, spark and danger during operation
Contact with [email protected]