MOQ | 10 tons |
Port | SHANGHAI |
Packaging | Steel belt hexagonal package/plastic film/woven bag/sling package |
Lead Time | 20-30days |
Product material:
St35.8/St45.8/St15Mo3/13CrMo44
Product applied standard:
DIN 17175
Finished products package:
Steel belt hexagonal package/plastic film/woven bag/sling package
Product manufacturing process:
Tube blank → Inspection (spectral detection, surface inspection, and dimensional inspection) → Sawing → Perforation → Thermal inspection → Pickling → Grinding inspection → Lubrication → Cold drawing → Lubrication → Cold-drawing (the addition of cycled processes such as heat treatment, pickling and cold drawing should be subject to the specific specifications) → Normalization or normalization + tempering → Performance test (mechanical property, impact property, hardness, flattening, flaring, and flanging) → Straightening → Tube cutting → Non-destructive testing (eddy current or ultrasonic) → Hydrostatic test → Product inspection → Immersion of anti-corrosive oil → Packaging → Warehousing
Product manufacturing equipment:
Shearing machine, sawing machine, walking beam furnace, perforator, high-precision cold-drawing machine, heat-treated furnace, and straightening machine
Product testing equipment:
Outside micrometer, tube micrometer, dial bore gage, vernier caliper, chemical composition detector, spectral detector, tensile testing machine, Rockwell hardness tester, impact testing machine, eddy current flaw detector, ultrasonic flaw detector, and hydrostatic testing machine
Product applications:
Steam boilers, pipelines, pressure vessels and instruments operating at high temperatures
SanHeKou Industry Area,ZhengLu Town, ChangZhou China