MOQ | 100 pieces |
Port | Yantian |
Packaging | Poly bag packed in Blister tray , then in Carton |
Lead Time | 3 weeks |
Product description
Plastic parts
1. Material options: PC ABS POM PP ,Glass fiber, PMMA, Nylon, PA6,PA66,etc.
2. Post-treatment: Oil painting, Silk screen printing, pad printing, laser engraving, sand blasting, powder coating
3. Mold base standard: LKM
4. Surface finish: Polishing
5. Color options: Per pantone code
6. Certification: ISO9001, ISO13485
Mould time: |
25-35 Days |
Product time: |
7-15 Days |
Mould cavity : |
one cavity , multi-cavity or same different products be made together |
Mould life : |
200000-1000000shots |
Runner system : |
Hot runner and cold runner |
Standard: |
HASCO, DME or dependent upon |
Main technology: |
Milling, grinding, CNC,EDM, wire cutting, carving, EDM, lathes, surface |
finish, etc. |
|
Design software: |
US, SolidWorks, Pro-E, 3D Max, AutoCAD and UG |
Sheet Metal Fabrication, metal stampings
1. Material options: Carbon steel, Stainless steel, Spcc, Copper and aluminium,etc.
2. Post-treatment: Oil painting, Silk screen printing, Pad printing, Laser engraving, Sand blasting, Powder coating, Plating, Anodizing, etc.
3. Mold base standard: LKM
4. Surface finish: Polishing
5. Color options: Per pantone code
6. Certification: ISO9001, ISO13485
Mould die time: |
15-25 Days |
Product time: |
7-15 Days |
Mould life : |
200000-1000000shots |
Main technology: |
Milling, grinding, CNC,EDM, wire cutting, carving, EDM, lathes, surface |
finish, Stamping, Punching, Tapping,etc. |
|
Design software: |
US, SolidWorks, Pro-E, 3D Max, AutoCAD and UG |
Machining parts
1. Material options: Carbon steel, Stainless steel, Brass, Engineering plastic (Delrin, POM, Peek, Tecaform SD,Torlon PAI4301 5530 PAI4203), and Aluminum, etc.
2. Post-treatment: Oil painting, Silk screen printing, Pad printing, Laser engraving, Sand blasting, Powder coating, Plating, Anodizing, etc.
3. Mold base standard: LKM
4. Surface finish: Polishing
5. Color options: Per pantone code
6. Certification: ISO9001, ISO13485
Product leadtime: |
10-25 Days |
Monthly capability : |
200000-1000000pcs |
Main technology: |
Machining, Turning, Milling, grinding, CNC,EDM, Wire cutting, Carving, EDM, lathes, Surface finish, Tapping, etc. |
Design software: |
US, SolidWorks, Pro-E, 3D Max, AutoCAD and UG |
1. We have 5 engineers supporting your project.
2. We have 5 QCs supporting your project.
3. We have 15 CNC Machining centers and 36 injection molding machines, 10 EDM, 2 W-EDM to ensure the best manufacturing quality.
4. We have 1 CMM, 2.5 measuring equipment, projector, hardness tester, height gauge, etc. Quality inspection equipment.
Packing Details : Carton box/Plywood cases
Delivery Details : International express for Low volume, sea freight for big volume/quantity
Delivery method: By UPS, DHL, Fedex, Air, Sea.
Company profile
Rollyu Precision Co., Ltd ,established in 2017,h as been always devoting to plastic injection molding, Plastic molded parts, Sheet metal Fabrication, metal stampings ,CNC machining, Aluminum Extrusion, Heat Sink ,Assembly, and manufacture over past 3 years.
Feel free to send your inquiry to get a quote and contact with us for a visit to our factory!
3/F, Building/9, 98 Industrial Park, Wanfeng Community Center Road, Xinqiao Street, Bao'an District,Shenzhen City,China