MOQ | 25 PCS |
Port | ningbo, zhejiang |
Lead Time | 3-7 work days |
The LBF-H use for horizontal shelf lighting generates optimal that the products are evenly lit, right to the back of the display. And it always lighting with LBF-VC、LBF-VL/R (Vertical Lighting). And LBF-H can connector each other to get enough lighting.