Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

formwork shuttering black brown film faced plywood 18mm factory price

FOB Price 20 - 24 USD / Piece
MOQ100 Piece/Pieces

Quick Details (View All)

Place of OriginShanxi, China Brand Nameformwork plywood
Model NumberW002-1 UsageIndoor
GradeFIRST-CLASS Main MaterialPoplar
Formaldehyde Emission StandardsE0 TypePlywoods
StandardUN,JIS,ISO9001:2008 CertificateISO 9001:2008/CE/TUV
Plywood Type9-Ply Boards Usefurniture/construction/decoration
Size1800*1200*18mm/as your demands density550--600kg/cbm
Moisture content10%--14% thinckness2.8mm--40mm
corepoplar/hardwood/combi

Product Details

formwork shuttering film faced plywood 18mm factory price  

 

 

ITEM:

Film faced plywood

THICKNESS:

2MM-30MM

SIZE:

4’X8’,4’X7’,4’X6’,3X7’,3’X6’ etc

FACE/BACK:

Birch,okoume/bintangor,beech,sapeli,ash,Keruing,poplar,pine,teak,cherry,red oak,white oak,

maple,walnut,

hictory etc natural veneer or engineering veneer.

GRADE:

A,B,C,D,E ,BB/CC etc

CORE:

Poplar core,combi core,all hardwood core etc

GLUE:

Formaldehyde emission:MR E2,E1,E0(P1,P2)

Water-proof:melamine,WBP 

Export standard PACKING:

Inner:with 0.2mm plastic bag.

Outer:outside covered with carton then  steel strip for strength, the bottom with  regenerative

 wood pallet.

STANDARD:

GB/T 9846-2004,ANSI/HPVA,IHPA etc.

CAPACITY:

5000M3/MONTH.

Payment item:

T/T,L/C etc

DELIVERY TIME:

Within 20 days.

MOQ:

One container.

APPLICATION:

Inside:Furniture,door,kitchen cabinets etc.

Ourside:construction etc.

 

 

 

Workshop:

 

 

 

FAQ

 

FAQ

1. Q: What's your MOQ(minimum order quantity)?

 

    A: Any quantity for the sample and stocks..

 

2. Q: What's your packing methods?

 

    A: Packed into plywood box/ton bag, or in bulk.

 

3. Q: What's your payment terms?

 

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

 

4. Q: What's your delivery time?

 

    A: 10-20 days after received the advance payment or L/C.

 

5. Q: Are you manufacturer or trader?

 

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.

  

6. Q: Can we visit your factory?

 

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

7. Q: Can you supply other scaffolding materials?

 

    A: Yes. All related scaffolding materials.

 

        (1) scaffolding system (ring lock system, frame, pipe&coupler system)

 

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500

 

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

 

        (4) steel coupler (preesed / drop forged)

 

 

Register Your Company