Style | Soft toy | Material | Soft plush with teeth |
Place of Origin | Jiangsu, China | Brand Name | Starstoy |
Model Number | rattle-2 | Product Name | Eco-friendly Infant Animal Handbells Baby Rattle Toy Educational Toys |
Size | 15cm | Type | Rattle Toy |
MOQ | 1000pcs | Certificate | ISO9001/EN71/ASTM/SGS |
LOGO | Customize accept | Sample Fee | US$100, refundable |
Sample Lead time | 3-7days | Production Lead Time | 45-55days |
Useage | Baby Toy |
Eco-friendly Infant Animal Handbells Baby Rattle
Toy Educational Toys
A professional manufacturer of Stuffed Plush Toys and Pet Products. provide OEM and ODM service for all the design you want.
Our factory has Disney production permission. And all our products meet EN71; ASTM; ISO9000 standard.
Welcome contact us anytime.
Skype: rachel54929
Phone: +86 181 1638 1290
Q1: How do you control the quality?
Our production quality level is AQL2.0/4.0; all products
conform to EN71, ASTMF963, EC, ISO9001 standard. Our QC
will control and inspect the quality and we will send you
inspection photos before shipment.
Also it's welcomed your QC come and inspects the quality
before shipment.
Q2: What is your MOQ (minimum order quantity)?
It depends on the size. Generally, our MOQ is 1000pcs/
style.
Q3: How much is the sample fee?
Normally is US$100/Style, but also up to the design and
size. Sample fee will be refunded to you after order
placed.
Q4: Why do you charge samples fee?
We need to order the material for your customized
designs, pay the printing and embroidery, and designers'
salary. Most importantly the sample fee will be refunded
to you once order confirmed.
Q5: Could I custom our design/ logo?
Of course, We have our own designer, you can give your
logo and idea to us, we can provide the design work.
Q6: Could you help for the design?
Yes, you can give your idea to us, our designer will
provide the artwork for you approve.
Q7: How long is your sample lead time and production
lead time?
Prototype sample: 1-3 days.
Complete sample: 3-5 days after prototype sample
confirmed.
Production lead time: 45-55days after sample confirmed
and prepayment paid.
Q8: What is your payment term?
T/T (30% deposit, 70% before shipping), L/C