MOQ | 10000 Kilogram/Kilograms |
Type | METALLIC YARN | Place of Origin | Jiangsu, China |
Brand Name | Genzon | Product name | BOPET film |
Color | Transparent | Certificate | ISO14001,ISO45001 |
Thickness | 8mic to 75mic | Width | 500-3300mm |
Length | 600-3600m | Inner Core : | 3" or 6" |
Packing | Wooden packaging | Size | Customized |
Sample | A4 free Samples |
Coating
products: there is no obvious abnormality before the film
is processed, and wrinkling is obvious after the oven is
cooled after processing.
1,Cause analysis:
(1) Slitting small rolls and insufficient stress
release;
(2) There is a large difference in the ratio of
vertical and horizontal shrinkage of the films, leading to
the crystallization rate or non-uniform secondary shrinkage
after high temperature;
(3) Uneven thickness of the film itself, coating
film on the substrate level requirements of higher, coating
after completion of the film defects more
obvious;
(4) The local deviation of the uneven crystallinity
of the film after TDO (horizontal pull) shaping and cooling
is large.
2. Preventive Measures:
(1) Adjust the appropriate slitting and rewinding
pressure;
(2) Adjust the process parameters so that the fim's
vertical and horizontal shrinkage ratio is in an
appropriate range;
(3) The production control film surface is smoother
and the average deviation is smaller;
(4) Adjust TDO (horizontal pulI) temperature to
make crystallization faster and more uniform. Defective
film surface printing and aluminum
plating
1. Cause analysis:
(1) The non-uniform wetting tension of corona does
not meet the requirements;
(2) Oil oil is thrown to the film surface during
film drawing production, causing film surface
pollution;
(3) Problems occurred in the process of customer
processing
2. Preventive Measures:
(1) Adjust the electrode spacing of corona
generator to make corona uniform, and increase the power to
make the wetting tension meet the customer's demand,
greater than 56 Dyne;
(2) The equipment shall be flled with bearing
lubricating oil in appropriate amount and promptly clean up
the spilled grease;Avoid throwing to the film surface
during production operation
(3) Solve this problem through customer analysis in
use
After slitting and packing, the paper tube and film
roll delamination slip out when the film
roll
is transported for a period of
time.
1. Cause analysis:
(1) The water content of the paper tube core is not
qualified. In a high temperature
environment, the water evaporates and the paper
tube core shrinks, leading to a smaller
outer diameter.
(2) The starting speed was too fast, and the
tension could not keep up with the
pressure,
leading to the loose winding at the
beginning.
2. Preventive measures
(1) Incoming material inspection shall strictly
check the water content test results, and
the
warehouse shall have temperature and humidity
control.
(2) The winding speed of the first 100 meters is
controlled at 50~80min/m.