Place of Origin | Guangdong, China | Brand Name | LanLin |
Model Number | LL-GKE-039 | Type | Electric Go Karts |
Certification | ce | Engine | electric |
Drive Mode | NO | Wheel Size | 140CM |
Oil Tank Capacity | NO | Maximum Speed | 20km/h |
Displacement | NO | Brake Type | foot brake |
Engine Capacity | NO | Product name | go kart pedales adulto |
Material | FRP fiber, metal, automotive paint | Climbing ability | greater than or equal to 35 degrees |
Normal load | 75 kg | Motor power | 500W |
Life time | 4-6H | Gears | high speed, medium speed, low speed |
Charging time | 8-10H |
Q1: Minimum order
quantity?
A: Usually, our MOQ is 1 piece,
but if customized brand, we have quantity requirement in
different items. We welcome new customer place a trial order to
test the products quality and the sales in their
markets.
Q2: Delivery
Day?
A: It depends on order item and
quantity, usually our delivery day is 3 to 20days after
received deposit.
Q3: If the voltage and
plug of your product will come with my
standard?
A: We will confirm voltage and
plug with customer before production, and we will produce
machines as the customer's requests.
Q4: If your company can
custom product as my required and put my logo
on?
A:Yes, all of our product are
designed and customized as required including color, print,
pattern and logo.
Q5: Lifetime of your
product?
A: It's according to the
maintenance of product, generally speaking it's about 3-5
years.
Q6: How about
malfunction?
A: Our technician will make a
professional solution with picture or video for customer, which
shows how to operate step by step. If the spare part breaks we
will replace it for customer with kind of charge or without
charge.
Q7: Different coins from
different countries can be acceptable to coin
selector?
A: Different coins from
different countries can be accepted by coin selector. Also we
can install a note recognize devise into the machine (as
usually comes with the coin one).
Q8: How long will it
takes to deliver goods from china to my
country?
A: As for the time different
port is different. Generally speaking it is about one month by
sea,3-7 workdays by air.